Unit 1 of 7
OpenDay 1 — Your scope is set
What you have afterwards: One core loop, one release goal and written non-goals.
Goal
You decide what your app does in its first release — and what it explicitly does not.
Understand briefly
“Done in seven days” can mean four different things: a clickable prototype, an installable device build, an internal test channel or a public store version. These are not the same, and review, test phases and account checks are not in your hands. Your first release therefore needs exactly one short chain: open → complete one task → understand the result → continue meaningfully. Anything that does not improve that chain is a non-goal.
Follow along
Paste this prompt into the AI tool you work with:
I am building a small app. My idea in two sentences: [YOUR IDEA]
Help me shrink the scope instead of growing it:
1. Express my core loop as a chain of four steps (open → complete one task → understand the result → continue).
2. Name five features I should cut from the first version and justify each in one sentence.
3. Turn that into a short spec with the sections target user, core problem, core loop, non-goals and acceptance criteria.
Ask me questions before assuming anything.Build it yourself
Finish the spec yourself: target user, core problem, core loop in four steps, at least five non-goals and your actual release goal — prototype, device build, internal test or public version.
Verify
Only tick a box once you have really checked it. These criteria are the only way to finish this unit.
0 of 4 confirmed
Still open: 4 criteria
Self-check
Three questions about decisions you made today. There are no points and no grade — only the why. Every answer can be changed.
0 of 3 answered
Next step
Tomorrow you get this scope running for the first time.
Next: Day 2 — A real build runs